BlueWaveConsulting 022 656 3963Call

Insights

The difficult parts of NZS 3910, from real contracts

Guides on the issues that cause the most argument on site and in payment schedules. Each one is drawn from contracts I’ve administered, with the parties left out. General guidance only, not advice on a particular contract.

Claims and money

On site

The role and the client

Free tool

Have a question about your own contract?

Describe a variation, delay or payment problem and the contract question tool works it through using the same method as these guides. Use it to test your thinking before you respond.