A variation, extension of time or payment claim assessed under NZS 3910:2013 or 2023. For the Engineer, Contract Administrator or Principal, or the consultancy acting for them. You get a written assessment you can act on, that still stands up if it’s challenged.
If some of that doesn’t exist, tell me. That’s worth knowing early and it shapes where to start.
A written assessment memo. The answer is on page 1. Everything behind it is set out so the reader can check it and see exactly where it departs from either party’s position. For a variation with time attached it usually runs like this:
I assess and recommend. The decision stays with the Engineer, Contract Administrator or Independent Certifier.
Not either party’s account. The clause, the specification, then the diaries, the site camera, the test results and the emails. If that doesn’t settle a technical point, it goes to someone who has dealt with it before. I don’t commit to a position until one of them supports it.
An event can be real and still not delay completion. So time is assessed on the accepted programme, with actual dates loaded and weather set to zero so the Principal’s risk is isolated. For a disputed period I build 3 timelines side by side: no event, the event handled at a reasonable pace and what actually happened. The gap between the first 2 is the Principal’s. The gap between the last 2 is the contractor’s. None of the assumptions asks the contractor to go faster than it did or said it would. How the 3 timelines work →
On a payment claim, items I can verify are passed. Items that need adjusting get a reason. Items I can’t verify are named as such, not guessed at. Lump sums that aren’t finished aren’t paid as finished. On NZTA contracts that includes Schedule 17 cost fluctuation, where negative months are deferred and trued up, not dropped.
If the contractor has a point, the assessment says so. If I’ve got something wrong, I correct it, whether or not anyone has noticed.
The variation that isn’t what it says →
Splitting the days: how a delay claim actually gets assessed →
Charging costs back to the contractor →
Payment claims: the 8 places the number goes wrong →
The contractor’s claim workbook: 7 things to check →
Tell me your deadline on the first call and I’ll tell you straight whether I can meet it. Each assessment is priced once I’ve seen what’s involved, so you know the cost before I start.
Call first to talk through the deadline, then send the documents by email.